NHoboken, New Jersey

Jersey City/Hoboken Connectivity Study

The primary goal of this project is to identify recommendations to improve the connectivity of the street network between Jersey City and Hoboken within the study area for all modes of travel while working within the existing constraints of a limited transportation network.

The project team, composed of Eng-Wong, Taub & Associates, Howard/Stein-Hudson, Stump Hausman Partnership, and AKRF, was retained by Hudson County to prepare the Jersey City/Hoboken Connectivity Study. The study was funded through the North Jersey Transportation Planning Authority’s Subregional Studies Program with financing by the Federal Transit Administration and the Federal Highway Administration of the U.S. Department of Transportation.

Biggest changes:

  • A connector road from Cole Street to Paterson Ave.  
  • Grove St., Marin Blvd. and portions of Observer Highway/Newark Ave becoming one-way roads. 
  • Elimination of parking on Vezzetti Way.
  • Bike Lanes
  2PM, Dec 7 2011
Comments 64 notes


    blog comments powered by Disqus
  1. neighborhoodr-hoboken posted this
  About Neighborhoodr
  Neighborhoodr is a local neighborhood blog network where anyone can quickly and easily post about what's happening in their neighborhood without having to log in or register.

Have news you'd like to share about your neighborhood? Just use the share buttons along the top of the page.
  Editors
 

Interested in becoming an editor for this blog? Email us at hi@neighborhoodr.com for more information.